Project

General

Profile

Actions

Bug #10629

open

Kiosk enrollment not working in super tenant

Added by Arshana Atapattu 9 months ago. Updated 29 days ago.

Status:
On hold
Priority:
Critical
Start date:
27/09/2024
Due date:
30/09/2024 (30 days late)
% Done:

0%

Estimated time:
Device Type:
Component:
Type:
Android

Description

Environment details
6.0.1 server

Prerequisites
none

Steps
try to enroll a kiosk with QR through Agent

Description
In super tenant the device was not enrolled in super tenant. it was worked with sub tenants.
This is working in both tenants as Kiosk QR after factory reset.

Error log [1]

Result

[1]
"come to a black screen and doesnt proceed further

TID: [-1234] [] [2024-01-23 12:28:23,447] INFO {org.apache.synapse.mediators.builtin.LogMediator} - {api:admin--Android-Mutual-SSL-Device-Management} STATUS = Executing default 'fault' sequence, ERROR_CODE = null, ERROR_MESSAGE = null"

Actions #1

Updated by Viranga Gunarathna 9 months ago

  • Project changed from product-uem 6.1.0 GA to Backlog
Actions #2

Updated by Arshana Atapattu 6 months ago

  • Project changed from Backlog to product-uem 6.2.0 GA
  • Subject changed from Kiosk enrollment to Kiosk enrollment not working in super tenant
  • Priority changed from High to Critical
Actions #3

Updated by Viranga Gunarathna 6 months ago

  • Type set to Android
Actions #4

Updated by Sandaru Daminda 5 months ago

  • Due date set to 27/05/2024
  • Start date changed from 07/02/2024 to 22/05/2024
Actions #5

Updated by Sandaru Daminda 5 months ago

  • Due date changed from 27/05/2024 to 04/06/2024
Actions #6

Updated by Sandaru Daminda 5 months ago

Tried to reproduce it with Google Pixel and Xiaomi devices and the issue did not reproduce.
Need to check the exact device.

Actions #7

Updated by Sandaru Daminda 4 months ago

  • Status changed from New to On hold
Actions #8

Updated by Thilina Sandaruwan 4 months ago

  • Project changed from product-uem 6.2.0 GA to Backlog
Actions #9

Updated by Sandaru Daminda 3 months ago

  • Project changed from Backlog to product-uem 6.3.0 GA
  • Due date changed from 04/06/2024 to 09/09/2024
  • Start date changed from 22/05/2024 to 04/09/2024
Actions #10

Updated by Sandaru Daminda about 1 month ago

  • Due date changed from 09/09/2024 to 30/09/2024
  • Start date changed from 04/09/2024 to 27/09/2024
Actions #11

Updated by Inosh Perara 29 days ago

  • Project changed from product-uem 6.3.0 GA to Backlog
Actions

Also available in: Atom PDF